Overload handling of IBT using load and capacitor shedding

Penulis: Rabbani, F.M.; Ardita, I.M.; Aryani, D.R.; Jufri, F.H.; Utomo, A.R.
Informasi
JurnalIOP Conference Series: Materials Science and Engineering
PenerbitIOP Publishing Ltd
Volume & EdisiVol. 673,Edisi 1
Halaman -
Tahun Publikasi2019
ISSN17578981
Jenis SumberScopus
Abstrak
Faulted Inter Bus Transformer (IBT) can cause power system instability. Therefore, it will be isolated to prevent the spreading of disturbance. IBT at the Ptn Substation which supplies Ptn - Grt and Dwt Subsystem is discussed in this paper. The event discussed is 2 of 3 IBTs are out of work so that only one left. So, load shedding of Dwt Subsystem is required to avoid further disturbance. However, after it is applied, the voltage at the Dwt Subsystem will increase beyond the allowed rating. Therefore, further action is required by releasing some capacitor banks of several substations that have the highest rated voltage until the voltage in all substations is within the permitted rating. Finally, The system return to stable after load shedding with total 226.45 MW and capacitor shedding with total 150 Mvar. © Published under licence by IOP Publishing Ltd.
Dokumen & Tautan

© 2025 Universitas Indonesia. Seluruh hak cipta dilindungi.